A lot of our customers are investing in equipment and infrastructure to support Future Fuels at the moment. This was the case for a project we recently took on with UM Terminals who were looking for a 1 arm skid suitable for loading HVO.
The client were prioritizing efficiency and so high flow rates were essential. The solution we recommended was our 4” Electronic Bottom Loading Skid, which gives flow rates up to 1500l/m, filling a 36,000 litre tanker in less than 30 minutes.
The client took on the installation of the skid themselves, so we made sure to deliver the equipment well within the 12 week lead time so that they could be up and running as quickly as possible.
The client were very happy with the result as they have now been able to accommodate HVO on their site and boast high flow rates and efficient loading times.